Service & Support

R&D capability, customization process, quality control, delivery and after-sales support.

SERVICE FLOW

From requirement to delivery

Five steps: assess the fibre, choose the model, test a unit, integrate and accept, then deliver and train. Every step has defined inputs and outputs.

Selection reply
1–2 business days
Trial testing
1–2 weeks
Minimum order
1 unit
Support
Ongoing
Request a selection
  1. 01

    Requirement and fibre assessment

    3–5 business days

    Define what is measured and what the fibre allows.

    • Application and monitoring target
    • Range / spatial resolution / channel count
    • Fibre type and available strands on site
  2. 02

    Selection and proposal

    1–2 business days

    Choose an instrument or a card, and the exact model.

    • Recommended model and configuration
    • Host software integration
    • Proposal and quotation
  3. 03

    Prototype testing

    1–2 weeks

    Confirm feasibility with measured data.

    • Trial unit on site or shipped
    • Measured link loss and SNR
    • Test record issued
  4. 04

    Integration and acceptance

    ~1 week

    Connect to the site system and sign off.

    • Integration with existing platforms
    • Alarm thresholds and event rules
    • Acceptance report
  5. 05

    Delivery and training

    Per contract

    Hand over hardware and documentation with ongoing support.

    • Hardware and technical documents
    • Operation and maintenance training
    • Remote and on-site support